Engineering digital twins

Implementing a BIM strategy and collaborative platform

Implementing a BIM strategy and collaborative platform

Objectifs

  • Define BIM strategy, i.e. objectives, scope and uses
  • Drawing up and implementing the BIM agreement
  • Implementing BIM and its collaborative platform
  • Manage project execution using BIM and its methodology
  • Designing the BIM and its collaborative platform for data exploitation by a digital twin
Implementing a BIM strategy and collaborative platform

Acteurs concernés

  • Local authorities / EPCI
  • Dealers/ Operators
  • Manufacturers/ Equipment suppliers
Implementing a BIM strategy and collaborative platform

Avantages

  • Setting clear objectives
  • Relevant perimeter ensures that BIM is applied where it brings the most value
  • Alignment with uses
  • Facilitating collaboration between stakeholders
  • Optimized project management
  • Improved decision-making based on up-to-date data
  • Cost reduction

Although BIM (Building Information Modeling) has now become a regular part of the language used by professionals in the construction, development and modernization of infrastructures, the methodology requires the support of real specialists. BIM results can clearly vary according to the ability to integrate and master this technology!

For over ten years, Egis has been integrating BIM processes into the operational management of its digital transformation. This (3D) modeling method creates a detailed digital representation of a building or infrastructure, integrating design, construction and management information throughout its lifecycle. Egis, through the development of a useful modeling strategy, clearly defines the objectives of BIM integration, the scope of the project and the specific uses of the model. At this stage, establishing a BIM agreement with the best possible visibility structures the cooperation between the various project stakeholders in an efficient and legible way. This step is decisive for the coherence of the implementation: once the BIM model has been created in accordance with the agreement, its match with the digital twin will be optimized. This integration involves an operational link between the BIM model and data from other modules: IoT sensors, databases collected in real time, facility management systems, etc.

Implementing a BIM strategy and collaborative platform

Avantages

  • Setting clear objectives
  • Relevant perimeter ensures that BIM is applied where it brings the most value
  • Alignment with uses
  • Facilitating collaboration between stakeholders
  • Optimized project management
  • Improved decision-making based on up-to-date data
  • Cost reduction