A 5.3km-long double bridge, opened in 1977 and designed to withstand extreme seismic events, underwent a detailed assessment of its condition and the defects affecting each of its components.
Egis produced a functional model of the bridge, which was then integrated into a digital operating twin. This technology makes it possible to supervise the overall condition of the bridge, analyze defects in several parts, and plan maintenance operations on each element. A dynamic 3D synoptic of the bridge, combined with an interactive dashboard, provides a synthetic view of its condition.
Specific performance indicators calculate a health index for the bridge and its main components, facilitating decision-making.