Challenge
- a district heating plant producing heating and cooling
- a vertical waste treatment center
- a waste collection center
- an urban distribution center
- a sewage sludge treatment network
- a funicular railway station
- a concrete plant and
- parking.
Expertise
This extraordinary project required a project management team with a bespoke method and organization, mobilizing several areas of expertiseArchitecture – Double organization of the base using multi-criteria architectural, functional and technical analyses.
Civil engineering – Integrating the towers into the base
Geotechnical engineering – Consideration of seismicity and interfaces with adjacent structures and supports
Hydrogeology – Foundations in the presence of groundwater and underground flows
Management of excavated material – Treatment of polluted soil and disposal of excavated material
Logistics – Flow and traffic management through dynamic simulation at access points and inside the base during construction and operation.
Safety – Integrated approach to safety (industrial, public, underground) adapted to the use of each component of the base.
Networks – Water, air, SSI and electricity supply to the various compartments.
BIM – Collaborative design on a BIM platform