Supporting the digital transition of a nuclear power plant undergoing renovation

In 2022, a nuclear power plant embarks on a major refurbishment of six of its eight units to ensure a sustainable energy source until 2064.
The digital twin being built with the support of Egis, will facilitate the operation for the next 40 years of one of the world’s largest nuclear power plants, built in the 1980s.
plant-aveva-3d-rendering

Added value

Supporting the digital transition of a nuclear power plant undergoing renovation

Customer benefits

  • Moving from a document-centric to a data-centric model.
  • Benefit from a successful transition to a data-centric model with the AVEVA Suite application.
  • Significant advances in operational efficiency and project sustainability.
Supporting the digital transition of a nuclear power plant undergoing renovation

Egis contributions

  • Review customer plans and results.
  • Review and support the development of platform maintenance plans from an organizational perspective (organizational changes, resource plans).
  • Provide information on key issues and lessons learned for AVEVA 1D/2D/3D and AIM (formerly AVEVA Net).
  • Support the benefits and return on investment after deployment of AVEVA 1D/2D/3D and AIM (formerly AVEVA Net).
  • Reverse engineering: how to optimize the model in E3D, 3D hybrid models, modification for brownfield sites.
  • Customer suppliers’ strategies for change management.

Key figures

Problems solved with the AVEVA Suite application
20%
Analyzed data
80%
Useful data over time
60%
Sharing a reference sheet is very easy :
You can copy this link
Or fill emails of recipient in following field in a comma-separated format:
Sharing well done
An error occurs after sharing the sheet